San Luis Potosí · pricing node · SIN · OCCIDENTAL · SAN LUIS POTOSI
Minera San Xavier (03MSJ-115)
Minera San Xavier is a CENACE pricing node in Cerro de San Pedro, San Luis Potosí. In October 2026 its day-ahead price averaged 887 MXN/MWh, 31% below September; real-time averaged 943 (September).
Day-ahead · MDAOct 2026887MXN/MWh▼ 31% vs Sep 2026744 hours observed
Day-ahead · MDASep 20261,293MXN/MWh720 hours observed
Real-time · MTRSep 2026943MXN/MWh▲ 32% vs Aug 2026720 hours observed
Real-time · MTRAug 2026714MXN/MWh744 hours observed
In San Luis Potosí
77 of 99 nodes in San Luis Potosí by Oct 2026 day-ahead price (1 = highest). State range 790–1,005 MXN/MWh; state average 888, weighted by hours observed.
Same load zone: SAN LUIS POTOSI
Oct 2026 day-ahead average, MXN/MWh
- San Luis Industrial 03SLI-115892
- San Luis Progreao 03SPR-115892
- Vidriera 03VRA-115892
- El Arbolito 03ABO-115891
- Barracuda 03BCD-115891
- Robert Bosch Mexico Sistemas Automotrices 03BOS-115891
- Colinas 03COI-115891
- Cummins Grupo Industrial 03CSF-115891
- Eaton Truck Componentes 03EAT-115891
- Fevisa Industrial 03FVS-115891
- Grupo Acerero 03GAS-115891
- G.Tigre 03GRP2115891
What this number is: the arithmetic mean of the month’s node-hours, with no demand weighting. Methodology · Source: CENACE