Michoacán · pricing node · SIN · OCCIDENTAL · URUAPAN
Subestacion Tingambato (03STI-115)
Subestacion Tingambato is a CENACE pricing node in Tingambato, Michoacán. In October 2026 its day-ahead price averaged 1,059 MXN/MWh, 26% below September; real-time averaged 1,002 (September).
Day-ahead · MDAOct 20261,059MXN/MWh▼ 26% vs Sep 2026744 hours observed
Day-ahead · MDASep 20261,429MXN/MWh720 hours observed
Real-time · MTRSep 20261,002MXN/MWh▲ 31% vs Aug 2026720 hours observed
Real-time · MTRAug 2026765MXN/MWh744 hours observed
In Michoacán
45 of 115 nodes in Michoacán by Oct 2026 day-ahead price (1 = highest). State range 982–1,363 MXN/MWh; state average 1,095, weighted by hours observed.
Same load zone: URUAPAN
Oct 2026 day-ahead average, MXN/MWh
- Impamex 03IMP-1151,057
- La Esperanza 03LAE-1151,057
- Mirador 03MRR-1151,056
- Taretan 03TAR-691,052
- Zumpimito 03ZMP-691,052
- Uruapan Tres 03UPT-1151,051
- Charapan 03CHN-1151,035
- Paracho Dos 03POD-1151,035
What this number is: the arithmetic mean of the month’s node-hours, with no demand weighting. Methodology · Source: CENACE