Veracruz · pricing node · SIN · ORIENTAL · POZA RICA
Gutierrez Zamora Dos (02GZD-115)
Gutierrez Zamora Dos is a CENACE pricing node in Gutiérrez Zamora, Veracruz. In October 2026 its day-ahead price averaged 1,314 MXN/MWh, 10% below September; real-time averaged 970 (September).
Day-ahead · MDAOct 20261,314MXN/MWh▼ 10% vs Sep 2026744 hours observed
Day-ahead · MDASep 20261,457MXN/MWh720 hours observed
Real-time · MTRSep 2026970MXN/MWh▲ 33% vs Aug 2026720 hours observed
Real-time · MTRAug 2026728MXN/MWh744 hours observed
In Veracruz
139 of 167 nodes in Veracruz by Oct 2026 day-ahead price (1 = highest). State range 801–1,929 MXN/MWh; state average 1,653, weighted by hours observed.
Same load zone: POZA RICA
Oct 2026 day-ahead average, MXN/MWh
- Tuxpan Vapor 02TUV-4001,463
- Entabladero 02ETD-1151,290
- Tajin 02TAJ-1151,271
- Agua Fria 02AGF-691,257
- Tepeyac Veracruz 02TPY-1151,253
- Cazones 02CZN-1151,248
- Palmas 02PMM-1151,246
- Aeropuerto 02ARP-691,244
- Coatzintla 02CZT-1151,244
- Petroquimica Escolin 02PQS-1151,244
- Poza Rica Tres 02PRT-691,244
- Distrito Industrial 02DIN-691,242
What this number is: the arithmetic mean of the month’s node-hours, with no demand weighting. Methodology · Source: CENACE